Rescue Union School District

Educating for the Future, Together

This is a renovation of the Athletic Departments existing field that will consist of removal off all existing turf/weeds, soil analysis to determine what amendments are needed to promote new turf, integration of soil amendments through ripping and tilling, leveling/grading and finish grading, and adjustment of existing sprinkler system before installing new sod turf.